INSTRUCTION MANUAL3 YEAR WARRANTYKUSSMAUL ELECTRONICS CO., INC.170 CHERRY AVE., WEST SAYVILLE, N.Y. 11796-1221File: 091-75-at rev aRev: A, Date 3-19-0
NOTEThe Load Manager Mark IV-AT is designed to operate relays. It is notnecessary to connect to all the outputs. Any outputs, at the discretion ofth
CAUTIONThere are 5 switches, each with 5 levers.Only one lever on each switch may bein the “ON” position.Recognizing that priorities may change after
SEQUENCE CONTROLThe installer wiring the relays to the Load Manager Mark IV-AT controls load sequencing. In order tolimit the sequencing to fewer than
REV.B 2/19/99REDUCE123456789YELLOW10111213141516GROUNDTHIS LINE POWERS THE LOAD MANAGERCLOSE TO ENABLELOAD MANAGER1718GROUNDGROUND
SWITCH POSITIONRELAY REMOVED FROM SEQUENCING1 ON 62 ON 73 ON 84 ON 9SEQUENCER LOCKOUT PROGRAM SWITCHThis set of switches controlsthe priority for Rela
REV.C 1/9/02REV.B 2/18/99REDUCE123456789YELLOW10111213141516GROUNDTHIS LINE POWERS THE LOAD MANAGERCLOSE TO ENABLELOAD MANAGER1718GROUNDGROUNDGROUNDGR
INSTALLATION RECORD & WARRANTYDate InstalledInstalled ByVehicle IdentificationVehicle OwnerWARRANTYAll products of Kussmaul Electronics Company In
Comments to this Manuals